Storage tanks and process equipment at an industrial plant.

Coordinate production, quality and maintenance across the plant.

Batch records, process readings, lab results and equipment history all shape the production plan. Bourne connects them, finds affected orders and prepares work for production and maintenance. Quality decides what happens to a held batch.

Talk to us

By continuing, you agree that we may contact you about Bourne. Privacy policy.

01

Stop the transfer before the batch is filled.

The viscosity result for resin batch R-4167 is above the approved range. Filling has not started. Bourne links the sample to its recipe and tank, then prepares a transfer hold for quality to approve.

02

What happened during the run?

Reactor 3 spent 18 minutes above the recipe temperature band. The cooling valve responded more slowly than it did on the last accepted batch. Bourne puts the historian trace, operator log and maintenance record in one review. The process engineer decides whether the valve caused the deviation.

03

Move filling. Inspect the valve before the next run.

Quality still has R-4167 on hold. Bourne shows the filling slot and production orders that depend on it, prepares a revised plan for the scheduler, and requests a valve inspection before Reactor 3 starts another batch.