A worker checking a metal part with a caliper.

Find and contain defects before shipment.

Bourne links a failed inspection to affected stock and open work, prepares containment and routes disposition to quality before production releases the units.

Talk to us

By continuing, you agree that we may contact you about Bourne. Privacy policy.

01

Open the nonconformance where it happened

Capture the failed characteristic, measured value, work order, lot and station. Link the source result so quality can see the evidence.

02

Contain the affected work

Identify WIP, finished stock and related units that may share the issue. Make the hold and its owner visible to the next shift.

03

Record the disposition

Quality decides whether to rework, repair, use as is or scrap under the site's rules. Preserve approval and the subsequent inspection result.